Our Service

Construction of a water supply station in Kathu Subdistrict The total production capacity is 300 cubic meters per hour. and laying water pipes

  • 28.03.2024
  • 0 times

Project Owner : Super Water Company Limited
Location : Kathu District, Phuket Province
Hand Over Work : November 2020
Details : - Work station for water supply system, Mobile Pre Fab, size 300 m3/hr.
            - Pipe laying for area expansion, HDPE pipe laying, size 315 mm., distance of about 200 m. and HDPE pipe laying, size 225 mm., distance approximately 3,500 m.